Rendering Courtesy of Karleberger

All Children's Hospital & Medical Office Building/St. Petersburg, Florida

Architect
Karlsberger, Columbus, Ohio

Owner
All Children’s Health System, St. Petersburg, Florida

Size
675,000 sf- Hospital, 147,000 sf- Medical Office Building

Cost
$270 Million - Hospital
$31 Million - Medical Office Building
$301 Million - Total

TLC Services
M/E


The $301 million expansion at All Children’s Hospital is the most ambitious expansion in the hospital’s history. The project includes a nine-story children’s hospital with helipad, an adjacent medical office building, a central energy plant and a parking garage. The centerpiece is the $270 million, 10-level hospital, which has 240 private patient rooms, 96 NICU Beds, an Emergency Department and an Integrated Outpatient Care Center. Immediately adjacent to the hospital is the 147,000-sf medical office building. Constructed at a cost of $31 million, this integrated outpatient care center houses diagnostics (MRI, open MRI, CT and PET/CT), rehabilitative and therapy services and doctors’ offices. Covered parking for 1,000 vehicles adjoin both the hospital and the MOB. Serving the cooling needs of the facilities are three 1,500-ton chillers, while heating requirements for both HVAC and domestic water are via three 400-bhp natural gas-fired steam boilers. Both the hospital and central plant have full electrical redundancy, with six 2,000 kW generators, providing 100% power for life safety systems and critical hospital functions. All major equipment in the central energy plant is designed with N+1 redundancy.The central plant is designed to accommodate an additional chiller, boiler and two generators for future expansion without additional square footage.