Rendering
Courtesy of HuntonBrady
|
Florida
Hospital Ormond Memorial/Ormond Beach, Florida
Architect
HuntonBrady Architects/Orlando, Florida
Owner
Florida Hospital Systems/Orlando, Florida
Size/Cost
170,000-sf hospital, 772,733-sf MOB/$151 million
TLC Services
M/E/CT
 
To
meet the demands of a growing population, changing demographics
and an increase in emergency room visits, Florida Hospital,
Memorial Division embarked on a new 12-story, 245-bed
replacement hospital in Ormond Beach. In addition to the
replacement hospital, TLC designed the adjoining five-story
medical office building and new central plant. The need
for adequate space was a primary concern when master-planning
the new facilities. All the patient rooms will be private
and sized to comfortably accommodate patients, visitors
and equipment. The number of operating rooms will increase
to 15 while the Emergency Department will expand by nearly
20,000 sf and house 52 bays. Imaging, diagnostic and ancillary
spaces will also increase. Shell space is set aside to
accommodate 75 future beds.The central energy plant is
designed for future expansion and serves both the hospital
and medical office building.
|