Sand Pearl Resort Addition and Renovations/Clearwater, Florida

USGBC LEED® Silver

Architects
Adache Group Architects/Ft. Lauderdale, Florida

Developer
JMC Communities/St. Petersburg,Florida

Size
250,000 sf

Cost
$65 million

TLC Services
MEP


The Sandpearl Resort -- first new resort hotel on Clearwater Beach in 25 years -- more than lives up to its name. The four-diamond hotel features 258 rooms, a world-class spa, fine dining, state-of-the-art meeting rooms and ballroom, and more than 11,000-sf of retail space. It is also the first hotel/resort in Florida to achieve U.S. Green Building Council’s Leadership in Energy and Environmental (LEED®) certification, having achieved LEED Silver. In keeping with the developer’s wishes to make the hotel environmentally friendly, the mechanical and electrical design incorporates energy-efficient systems and equipment. Flexible air-conditioning and ventilation systems serve the different types of spaces including the lobby, kitchen and dining areas, retail areas and living spaces. The building management system employs a distributed network and direct digital controls system. The hotel is fully protected by sprinklers and is served by both wet pipe and pre-action sprinkler systems. TLC engineers worked closely with the hotel’s spa consultant to ensure that the mechanical, electrical, and plumbing systems suit the spa’s specialized ventilation requirements and other needs. Throughout the hotel, energy-efficient lighting is customized to suit the varied spaces and is managed by a computerized lighting control system.